My brother and I continued from the previous day by riveting the right wing upper skin to the wing skeleton. The right wing was then removed from the assembly fixture and placed in the storage cradle, see image 1. Then I riveted the left wing main ribs to the forward spar and clecoed on the left aft spar in preparation for riveting, see image 2.